Product-specific EPDs for your entire portfolio.
Get third-party verified EPDs for every SKU. Generate new EPDs in minutes and update them instantly when your data changes.
Your portfolio
Roof windows and accessories
5 models · 276 variants
- SizeFinishGlazingOpeningFlashing
Finishing verification
Today, trying to scale EPDs means cutting corners.
Calculators that never touch your BOM.
Fill out a simplified template and get a static PDF. It's manual, slow, error-prone, and disconnected from your products.
Single EPDs that stretch across entire product families.
Simple scaling gets most products wrong. Getting it less wrong takes more work than calculating each product directly.
Rubber-stamp verification that puts your claims at risk.
Internal verification won't hold up for long. More and more procurement teams demand third-party verified EPDs.
Variable is built for scale. Product-specific. Third-party verified. Always up to date.
- 90%
Time saved for your team.
- 100×
Lower cost per EPD than consultants.
- <60 days
From kickoff to live system.
Let machines do the manual work. Automation handles the tedious 90%.
From raw data to live models. AI transforms your input data, rule-based automations build models in minutes.
Transparent workflows, auditable results. Every rule and calculation follows standards and each step can be checked and audited.
Roof window RW-114
Each material takes the lane from its supplier's nearest origin.
PCR 2019:14 §4.5
=14.2t·km
One source of truth for LCA data. Publish PDF documents and digital EPDs, and get ready for Digital Product Passports.
True third-party verification, at scale. Independent verifiers, automated checks — no conflict of interest, no gaps.
Verification you can trust. Verifiers review and pre-verify the system and every EPD goes through third-party verification.
Guardrails on every variant. Results are checked against verified and locked-down rules. Errors are caught even before a verifier sees them.
Built to the standards. Conformant with ISO 14040/44, ISO 14025 and EN 15804+A2. Verified, not just name-dropped.

ISO 14040/44
Life cycle assessment
Conformant
ISO 14025
Environmental product declarations
ConformantEN 15804+A2
Core rules for construction products
ConformantAlways up to date. EPDs that update with your data, not with a consultant's calendar.
Dynamic EPDs. When data changes, affected EPDs are recalculated and re-verified, so published results are always up to date.
GWP-total A1–A3 · Roof window RW-114
- Q2 2025Background database updateNot in your EPD
- Q4 2025Supplier switches to recycled aluminiumNot in your EPD
- Q2 2026Plant moves to renewable electricityNot in your EPD
- Q4 2026National grid mix updateNot in your EPD
In sync, end to end. Connect ERP, PLM and other systems. Enrich product data in Variable, and send it back to the PIM, CRM and customers.
On data update
Roof windows · 276 SKUs
0
LCAs recalculated
0
EPDs re-verified
0
EPDs delivered
Version control and audit log. Every EPD version is traced to the exact BOM, datasets and rules it was calculated from.
Roof window RW-114
v4 · via Supplier data
92.3 kg CO₂e−7.9 vs v3
- BOM
- Rev C · 214 lines
- Datasets
- ecoinvent 3.12 · 38 supplier EPDs
- Rules
- PCR 2019:14 v1.3 · EN 15804+A2
- Verified
- Independent verifier · 5 Nov 2026
From kickoff to live system under 60 days. Variable's LCA experts work alongside your team at every step.
01 · Day 1
Kickoff
Most of the scoping is completed before you sign. At kickoff we confirm and share the action plan for data collection.
Kickoff to live system
Day 1of 60
KickoffCollect & transformModelVerify02 · Days 2–21
Collect & transform
We connect your data to our AI-powered data transformers and set up a system to collect data from suppliers and production sites too.
Kickoff to live system
Day 1of 60
KickoffCollect & transformModelVerify03 · Days 22–35
Model
We set up modeling blueprints: the rules and guardrails for each product group. Every specific product and variant is then calculated from its own BOM and parameters.
Kickoff to live system
Day 21of 60
KickoffCollect & transformModelVerify04 · Days 36–60
Verify
An independent verifier performs verification to approve the pre-verified system. Each blueprint gets verified along with a reference EPD. The system is ready to go live!
Kickoff to live system
Day 35of 60
KickoffCollect & transformModelVerify05 · Day 61 →
Live
Generate new EPDs whenever you need them. Watch every change in your data flow through each affected LCA model, through guardrails and re-verification, and out to publication. Our experts stay on your team for ongoing support.
Kickoff to live system
Live
KickoffCollect & transformModelVerify
Kickoff to live system
Day 1of 60








